Awka, Anambra State, Nigeria; www.suchnetcomsolar.com; Tel: (+234) 08171968872; [email protected]; [email protected]
Suchnetcom Solar LTD ('Our Youth Skill Development Training on PV Solar Installation on its Way )
Head Office:
Suite 5, Fab Anieh House, 89 Club Street (former Abakaliki Street), Awka, Anambra State Capital, Nigeria.
Tel: (+234) 08171968872, 08132643723;
Email: [email protected];
FB: suchnetcom.solar; TW: SNCS_Ltd; Skype: suchnetcom
Battery | Charge Controller | Container Power Plant | Inverter | LED Lights| Solar Panel | Stabilizer | Solar Lantern | Sunking and DLight Solar Lanterns | Solar Water Heater | Solar Streetlight | Micro Wind turbine (MWT) | Plug-and-Play Solar Power Generator(PPSPG) | Transient Voltage Surge (TVSS) | Surge Protection Devices (SPD) | HSPGS Powered Streetlight
Switching Procedure for 1.5KVA to 10KVA PPSPG
Switching Procedure for 1.5KVA to 10KVA PPSPG
The diagram (A) down on this page shows the labeled parts on the external of 1.5KVA, 2.5kVA to 10KVA PPSPG.
Whereas, diagram (B) and (C) respectively explain their
switching-On and switching-Off procedures.
Labeled Parts of Model SNCS1.5K to SNCS10K PPSPG
Labeled Parts of Model SNCS1.5K to SNCS10K PPSPG
Switching-On Procedure for SNCS1.5K to SNCS10K PPSPG
(Note: Switch-On by following the steps as labeled 1, 2, ...7 on the diagram)
Switching-On Procedure for SNCS1.5K to SNCS10K PPSPG
(Note: Switch-On by following the steps as labeled 1, 2, ...7 on the diagram)
Switching-Off Procedure for SNCS1.5K to SNCS10K PPSPG
(Note: Switch-On by following the steps as labeled 1, 2, ...7 on the diagram)
Switching-Off Procedure for SNCS1.5K to SNCS10K PPSPG
(Note: Switch-On by following the steps as labeled 1, 2, ...7 on the diagram)
- Home
- About Us
- SKILL TRAINING
- Plug-and-Play Solar Generator
- 10KVA PPSPG (Plug and Play Solar Power Gen)
- Automatic Isolation Power Switching
- Project Overview
- Design Consultancy
- Solar Home System
- HSPGS Powered Streetlights
- Solar Energy Solution
- Project List
- Solar Borehole Pump
- Solar Streetlight
- SHOP SNCS LTD
- Surge and Signal Monitoring Devises
- Wind Turbine
- Careers
- Customer Care
- Transformers
- Datalink Communications
- Legal
- Knowledge Base
- Site Survey Form
- Feedbacks and Comments
- Technical Supports
- Contact Us
- Home
- About Us
- SKILL TRAINING
- Plug-and-Play Solar Generator
- 10KVA PPSPG (Plug and Play Solar Power Gen)
- Automatic Isolation Power Switching
- Project Overview
- Design Consultancy
- Solar Home System
- HSPGS Powered Streetlights
- Solar Energy Solution
- Project List
- Solar Borehole Pump
- Solar Streetlight
- SHOP SNCS LTD
- Surge and Signal Monitoring Devises
- Wind Turbine
- Careers
- Customer Care
- Transformers
- Datalink Communications
- Legal
- Knowledge Base
- Site Survey Form
- Feedbacks and Comments
- Technical Supports
- Contact Us
Labeled Diagram Model SNCS1.5K to SNCS10K PPSPG
Switching-Off Procedure for Model SNCS1.5K to SNCS10K
Switching-On Procedure for Model SNCS1.5K to SNCS10K
Labeled Diagram for SNCS300 and SNCS500 PPSPG
Switching-on Procedure for Model SNCS300 to SNCS500 PPSPG
Switching-off Procedure for Model SNCS300 to SNCS500 PPSPG
Transient Volatge Surge Suppressor (TVSS) - for DC Power
Transient Volatge Surge Suppressor (TVSS) - for DC Power
Transient Volatge Surge Suppressor (TVSS) - for AC Power
Transient Volatge Surge Suppressor (TVSS) - for AC Power